Associate Project Manager · Transport for London

Complex infrastructure,
kept under control.

I’m Zaid Ismail, a London-based project manager. At Transport for London I manage scope, programme, cost and risk on the Piccadilly Line Upgrade, working with tier one contractors under NEC3 and NEC4 ECC Option C. Before that, at Bovis, I delivered projects for Manchester Airports Group and Network Rail Telecoms.

Portrait of Zaid Ismail
Years in delivery
4

Rail, aviation, telecoms and regeneration

Portfolio managed
£6M+

Across eight consulting engagements

Gross margin held
20%

Held consistently across the same portfolio

Data accuracy
40%+

Uplift from Power BI and SQL automation

Experience across

  • Transport for London
  • Manchester Airports Group
  • Network Rail Telecoms
  • Bovis Consulting
  • Lendlease
  • London Legacy Development Corporation

Profile

A project manager who controls the detail and keeps people aligned.

I manage projects end to end. I set up the governance and reporting, keep scope, programme and cost under control, take ownership of risk, and keep contractors, clients and senior stakeholders aligned. When it matters, I hold a contractual position on the evidence while keeping working relationships intact.

I’ve done this client side at Transport for London and in consultancy at Bovis, across live railway, aviation, telecoms and regeneration work. I also have a data background, with a degree in Business Information Systems and hands-on Power BI, SQL and Python, which I use to turn project information into reporting that leaders act on.

Based in
London, UK
Current role
Associate Project Manager, Transport for London
Core strengths
Project governance · Stakeholder management · Scope, programme and cost control · Risk ownership · NEC contract administration
Sectors
Rail · Aviation · Telecoms · Urban regeneration
Qualifications
APM PMQ (2024) · APM PFQ (2023)
Education
BSc (Hons) Business Information Systems, 2:1, University of Westminster
Target roles
Mid to senior project manager roles in infrastructure, transport and consultancy

Experience

Four years of delivery, client side and in consultancy.

  1. Feb 2026 – Present

    Transport for London

    Client side · London Underground

    Associate Project Manager

    Piccadilly Line Upgrade: a multi-site high voltage power programme delivered by tier one contractors under NEC Option C target cost contracts.

    • Manage delivery across live packages: scope, programme, cost and risk, from design submission through to site mobilisation.
    • Took ownership of programme risk and opportunity: re-established the risk review cycle, chaired the sessions, and brought a new risk manager up to speed.
    • Run project governance through progress meetings, formal minutes and RAG action tracking, with Excel and Power BI reporting for senior leadership.
    • Lead the interface with contractors, the distribution network operator and internal delivery teams to keep enabling works on programme.
    • Administer NEC3 and NEC4 ECC Option C contracts, covering early warnings, compensation event assessment and evidenced entitlement positions.

    Case study: HV Power Programme · Case study: Hatton Cross

    NEC3 / NEC4 ECC Option C · Governance · Risk management · Stakeholder management · CDM 2015 · Power BI

  2. Jan 2024 – Feb 2026

    Bovis Consulting

    Formerly Lendlease Consulting Europe

    Associate Project & Commercial Manager

    Project and commercial delivery for Manchester Airports Group and Network Rail Telecoms, client-side support on the Piccadilly Line Upgrade, and portfolio reporting for the leadership team.

    £6M+portfolio across eight engagements

    20%gross margin held consistently

    • Delivered project work for Manchester Airports Group and Network Rail Telecoms, managing scope, change, budgets and forecasting alongside client teams.
    • Planned and managed project resourcing, from onboarding contract staff and agreeing rates through to timesheets and utilisation, keeping teams resourced against client commitments.
    • Provided client-side governance, baseline tracking and change control for early contractor involvement and enabling works at Cockfosters Depot.
    • Led commercial reporting across the portfolio, replacing spreadsheets with Power BI dashboards for the leadership team.

    Case study: Aviation & Telecoms · Case study: Portfolio reporting · Case study: Generative AI bids

    Project delivery · Change control · Resource planning · Financial forecasting · Power BI · Generative AI

  3. Dec 2022 – Jan 2024

    Lendlease Development

    East London regeneration

    Assistant Social Impact Manager

    Project reporting and performance management across the Silvertown and Stratford Cross regeneration schemes.

    40%+improvement in data accuracy

    2major regeneration schemes

    • Coordinated project reporting and data across two major schemes, standardising templates and KPIs for the delivery teams.
    • Managed senior stakeholders including the company board, the Mayor of Newham and the Greater London Authority.
    • Judged a joint GLA and Microsoft education programme alongside the Mayor of London.

    Case study: Reporting Digitalisation

    Project reporting · Stakeholder management · Power BI · SQL

  4. Mar 2023 – Dec 2024

    London Legacy Development Corporation

    Board role

    Elevate Board Member

    Sat on the Elevate Board, supporting youth projects in Queen Elizabeth Olympic Park.

    £100K+secured for youth projects

    • Worked with external consultants and the board to develop the business plan that secured the funding.
    • Produced the annual report and board presentation, and led community initiatives for local young people.

Projects

Selected case studies.

01

Piccadilly Line Upgrade: High Voltage Power Programme

Transport for London · Associate Project Manager

Context
A multi-site power upgrade on a live London Underground line, delivered by tier one contractors on NEC Option C target cost contracts.
Outcome
Scope disputes settled from the works information before they became claims, contractor costs challenged against issued scope, and an evidenced record of lost access to defend the client’s entitlement position.
Read the full case study
Challenge
Keep a multi-contractor, multi-site programme on scope and on cost while protecting the client’s position, without damaging working relationships.
What I did
  • Managed contract administration with tier one contractors, using the works information to resolve scope and responsibility questions early.
  • Assessed compensation event quotations and variations against issued scope, challenging duplicated labour, preliminaries and management cost, and securing contingency items as separately priced options.
  • Raised early warnings on access disruption, design delay and contractor underutilisation, and took them to risk reduction meetings with a clear consequence, likelihood and mitigation for each.
  • Took ownership of the frustrated access record, reconciling planned possession shifts against site logbooks to evidence lost productive time.
Tools
NEC3 / NEC4 ECC Option C · Works information · Early warning and compensation event processes · Excel
Stakeholders
Tier one contractors · Programme delivery and commercial teams · Senior leadership
02

Hatton Cross: Substation Refurbishment and DNO Diversion

Transport for London · Associate Project Manager

Context
An asbestos removal and substation refurbishment package, plus the utility diversion needed to release the site for a substation extension.
Outcome
One agreed record of actions, owners and dates for the package team, and enabling works kept aligned to the wider schedule.
Read the full case study
Challenge
Late design submissions and approvals put a fixed start date at risk, and the network operator interface had to be picked up at short notice.
What I did
  • Managed the package from design submission to site mobilisation: temporary works design, scaffolding, temporary power, welfare, fencing and induction.
  • Escalated the late design approvals, holding the contractor to the programme without conceding contractual ground.
  • Set up the package governance: a multi-tab action tracker with RAG reporting, and the formal progress minutes.
  • Took over the utility interface, sequenced the exposure, isolation and removal of a redundant low voltage supply, and secured firm jointing dates and a programme window from the network operator.
Tools
Action tracker with RAG reporting · Formal progress minutes · Programme and milestone tracking
Stakeholders
Contractor · Distribution network operator and its contractor · Internal delivery team
03

Aviation & Telecoms Project Delivery: Manchester Airports Group and Network Rail Telecoms

Bovis Consulting · Associate Project & Commercial Manager

Context
Project and commercial delivery on aviation and telecoms work for two major infrastructure clients.
Outcome
Project teams resourced against client commitments, with budgets, forecasts and change kept under control.
Read the full case study
Challenge
Keep projects resourced, on budget and accurately forecast across two clients with different commitments.
What I did
  • Managed project scope, change and cost control alongside the client teams.
  • Ran fee forecasting, budgets, invoicing and revenue recognition for the projects.
  • Planned and managed resourcing: onboarding contract staff, agreeing rates, and tracking timesheets and utilisation.
  • Reported project and commercial status to the account leads.
Tools
Excel · Power BI · Financial forecasting models
Stakeholders
Manchester Airports Group · Network Rail Telecoms · Account leads · Contract staff · Finance
04

Portfolio Reporting and Business Intelligence

Bovis Consulting · Associate Project & Commercial Manager

Context
A consulting portfolio of eight engagements worth over £6M, reported to the leadership team every month.
Outcome
20% gross margin held consistently across the portfolio, and less effort behind month-end reporting for the leadership team.
Read the full case study
Challenge
The business ran on spreadsheet reporting, which made month-end reporting slow and labour-intensive.
What I did
  • Managed commercial performance across the portfolio.
  • Gathered requirements from directors, project managers and finance, mapped the existing process, then built Power BI dashboards for margin, cash flow, utilisation and project KPIs.
  • Ran user testing, handover and support so the tools were adopted.
Tools
Power BI · Excel · Requirements gathering · Process mapping · User testing
Stakeholders
Directors · Project managers · Finance · Leadership team
05

Generative AI Bid Support Tooling

Bovis Consulting · Associate Project & Commercial Manager

Context
A consultancy bidding for new work while launching a new digital services offering.
Outcome
Bid managers freed to focus on win themes, and faster bid turnaround.
Read the full case study
Challenge
Writing first drafts took bid managers’ time away from win themes.
What I did
  • Built AI agents that draft tender responses from the company knowledge base.
  • Supported the launch of the digital services offering with the sector leads, building client relationships across the public and private sectors.
Tools
Generative AI agents · Company knowledge base
Stakeholders
Bid managers · Sector leads · Public and private sector clients
06

Reporting Digitalisation: Silvertown and Stratford Cross

Lendlease Development · Assistant Social Impact Manager

Context
Two major East London regeneration schemes reporting to the board, the Mayor of Newham and the Greater London Authority.
Outcome
Data accuracy improved by over 40%, and manual work removed from the monthly cycle.
Read the full case study
Challenge
Financial and KPI reporting relied on manual spreadsheets each month.
What I did
  • Standardised reporting templates and performance metrics for the delivery teams.
  • Migrated financial and KPI reporting to Power BI with SQL-based automation.
Tools
Power BI · SQL
Stakeholders
Delivery teams · Company board · Mayor of Newham · Greater London Authority

Capabilities

What I bring to a project team.

Project delivery & governance

  • End-to-end project delivery, from design to mobilisation
  • Governance, progress meetings and formal minutes
  • Scope, change and cost control
  • Programme management and Primavera P6 reporting
  • Resource planning and utilisation
  • Contractor and subcontractor management
  • Stakeholder and client management

Contract & commercial

  • NEC3 and NEC4 ECC Option C target cost
  • Compensation events and quotations
  • Defined cost assessment
  • Early warnings and PM instructions
  • Budgets, forecasting and cost variance
  • Invoicing, valuations and margin control
  • Quotation and tender evaluation

Risk & assurance

  • Risk and opportunity ownership
  • Risk registers and risk reduction meetings
  • Mitigation tracking
  • Engineering access and possession planning
  • Temporary works coordination
  • CDM 2015 duties and audit readiness

Data & technology

  • Power BI dashboards and data models
  • Advanced Excel automation
  • SQL and Python
  • Generative AI for bids and document review
  • Requirements gathering and process mapping
  • User testing, handover and adoption

Qualifications & education

2024
APM Project Management Qualification (PMQ)
2023
APM Project Fundamentals Qualification (PFQ)
2023
Power BI Desktop for Business Users, QA
2022
Excel Basics for Data Analysis, IBM
2019 – 2022
BSc (Hons) Business Information Systems, Upper Second Class (2:1), University of Westminster
Languages
English (native) · Gujarati (native)

The full CV, ready to read.

View it in the browser, print it, or download the PDF.

Contact

Let’s talk.

For project manager roles, projects or a conversation about delivery, the quickest way to reach me is by email.